| Assessment Year | 1988 |
|---|---|
| Principal Product | MODULAR BUILDINGS |
| NAICS |
n/a
|
| SIC | 3448: Prefabricated Metal Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
n/a
|
| Annual Production | 35
pieces
|
| Production Hrs. Annual | 2,150
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,513 | 1,157,093 |
kWh
|
$0.064 |
| Natural Gas | $2,226 | 408 |
MMBtu
|
$5.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $92 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,340 | $3,965 |
$3,340
60,082
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $970 | $500 |
$970
18,464
kWh
|
- | |
| 03 | 2.6232: Install set-back timers | $425 | - |
$425
7,913
kWh
|
- | |
| 04 | 2.8114: Change rate schedules or other changes in utility service | $223 | - | - |
$223
-
MMBtu
|
|
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $150 | - | - |
$150
-
MMBtu
|
|
| 06 | 2.4312: Improve lubrication practices | $80 | - |
$80
1,465
kWh
|
- | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $92 | - |
$92
1,758
kWh
|
- | |
| 08 | 2.6232: Install set-back timers | $70 | $65 |
$70
1,172
kWh
|
- | |
| TOTAL RECOMMENDED | $5,350 | $4,530 |
$4,977
90,854
kWh
|
$373
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $92 | - |
$92
1,758
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs