Assessment Year | 1988 |
---|---|
Principal Product | PREFABRICATED STEEL |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 148 |
Plant Area |
n/a
|
Annual Production | 15,300
ton
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,160 | 1,258,499 |
kWh
|
$0.059 |
Natural Gas | $13,624 | 3,352 |
MMBtu
|
$4.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,491 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,001 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,470 | $150 |
$3,470
83,822
kWh
|
- | |
02 | 2.7245: Use direct air supply to exhaust hoods | $1,935 | $10,000 | - |
$1,935
-
MMBtu
|
|
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,325 | $1,200 |
$1,325
31,946
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $1,145 | $1,000 | - |
$1,145
-
MMBtu
|
|
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $520 | $520 |
$520
12,603
kWh
|
- | |
06 | 2.6218: Turn off equipment when not in use | $438 | $150 | - |
$438
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $400 | $1,000 |
$260
3,517
kWh
|
$140
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $76 | $220 |
$76
1,172
kWh
|
- | |
09 | 2.4312: Improve lubrication practices | $182 | - |
$182
4,396
kWh
|
- | |
TOTAL RECOMMENDED | $9,491 | $14,240 |
$5,833
137,456
kWh
|
$3,658
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,001 | $10,890 |
$4,066
97,597
kWh
|
$1,935
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs