ITAC Assessment: AM0032
ITAC logo
ITAC Assessment: AM0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product INSECTICIDES, HERBICIDES
NAICS
n/a
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area
n/a
Annual Production 1,540
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,053 1,936,401
kWh
Natural Gas $20,200 5,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $3,735 $6,790 - $3,735
-
MMBtu
02 2.8112: Combine utility meters $1,450 $2,000 - $1,450
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $115 $94 - $115
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $1,193 $504 - $1,193
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,096 - $1,096
24,912
kWh
-
06 2.4312: Improve lubrication practices $640 - $640
14,654
kWh
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $671 $2,325 $671
15,240
kWh
-
08 2.6232: Install set-back timers $325 - $325
5,275
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $72 $162 $72
879
kWh
-
TOTAL RECOMMENDED $9,297 $11,875 $2,804
60,960
kWh
$6,493
-
MMBtu
TOTAL IMPLEMENTED $2,804 $2,487 $2,804
60,960
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs