ITAC Assessment: AM0017
ITAC logo
ITAC Assessment: AM0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ILLUMINATED PLASTIC SIGNS
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 14,300
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,069 883,939
kWh
Natural Gas $44,440 7,838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $11,970 $190 $11,970
-
kWh
-
02 2.8121: Apply for tax-free status for energy purchases $1,010 $360 - $1,010
-
MMBtu
03 2.2437: Recover waste heat from equipment $1,376 $1,100 - $1,376
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $875 $300 $875
27,843
kWh
-
05 2.6232: Install set-back timers $550 - $550
17,585
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $849 $3,033 $(-504.0)
(-9,965)
kWh
$1,353
-
MMBtu
08 2.2511: Insulate bare equipment $359 $1,670 - $359
-
MMBtu
TOTAL RECOMMENDED $16,989 $6,653 $12,891
35,463
kWh
$4,098
-
MMBtu
TOTAL IMPLEMENTED $16,989 $6,653 $12,891
35,463
kWh
$4,098
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs