ITAC Assessment: AM0016
ITAC logo
ITAC Assessment: AM0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 75,000,000
pieces
Production Hrs. Annual 7,752
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,940 4,851,114
kWh
Natural Gas $2,163 361
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $5,785 $10,000 $5,785
206,624
kWh
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $631 - $631
15,826
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $412 $464 $412
10,844
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $478 $500 $478
8,499
kWh
05 2.6232: Install set-back timers $163 - $163
5,862
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $61 $54 $61
1,172
kWh
TOTAL RECOMMENDED $7,530 $11,018 $7,530
248,827
kWh
TOTAL IMPLEMENTED $1,745 $1,018 $1,745
42,203
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs