Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Produce packaging
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 500,000,000
lb
Production Hrs. Annual 5,928
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $690,404 10,890,156
kWh
Electricity Demand $26,923 9,198
kW-mo/yr
Electricity Fees $27,452 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,748 $166,850 $35,437
558,951
kWh
- $1,311 - -
02 2.7224: Reduce space conditioning during non-working hours $18,385 $1,317 $17,729
279,634
kWh
- $656 - -
03 2.7111: Reduce illumination to minimum necessary levels $16,090 $6,000 $14,288
225,361
kWh
$1,228
-
kW-mo/yr
$574 - -
04 2.7134: Use photocell controls $12,869 $480 $12,410
195,743
kWh
- $459 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,715 $640 $2,618
41,300
kWh
- $97 - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,657 $30 $2,562
40,408
kWh
- $95 - -
07 2.7135: Install occupancy sensors $2,585 $600 $2,493
39,319
kWh
- $92 - -
08 2.7224: Reduce space conditioning during non-working hours $2,187 $660 $2,109
33,259
kWh
- $78 - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,402 $1,225 $739
11,851
kWh
- $27 - $636
10 4.611: Begin a practice of predictive / preventative maintenance $17,665 $4,340 - - - $2,500 $15,165
TOTAL RECOMMENDED $113,303 $182,142 $90,385
1,425,826
kWh
$1,228
-
kW-mo/yr
$3,389 $2,500 $15,801
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs