| Assessment Year | 1987 |
|---|---|
| Principal Product | PREFABRICATED METAL BUILDINGS |
| NAICS |
n/a
|
| SIC | 3448: Prefabricated Metal Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
n/a
|
| Annual Production | 120
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $36,539 | 483,880 |
kWh
|
$0.076 |
| LPG | $7,358 | 943 |
MMBtu
|
$7.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,605 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $945 | $300 |
$945
27,843
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $279 | $94 |
$279
4,396
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $555 | - |
$555
8,499
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $460 | $300 |
$460
13,482
kWh
|
- | |
| 06 | 2.7261: Install timers and/or thermostats | $362 | $500 |
$362
13,189
kWh
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $460 | $200 | - |
$460
-
MMBtu
|
|
| 08 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $283 | $50 |
$283
8,206
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83 | $67 |
$83
1,172
kWh
|
- | |
| TOTAL RECOMMENDED | $3,427 | $1,511 |
$2,967
76,787
kWh
|
$460
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,605 | $1,150 |
$2,605
71,219
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs