Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

228

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,075k 227k
MMBtu
$6.60
- Electrical $412k 11,151k
kWh
$0.049
- Natural Gas $412k 90k
MMBtu
$5.69

2,336

Recommendations

10.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $141k 11k
MMBtu
4.9%
- Electrical $42k 1,079k
kWh
9.7%
- Natural Gas $70k -
MMBtu
-
Waste $11k
Productivity/Other $27k
TOTAL $179k
*May be negative reflecting an increased cost component required to save energy and costs overall

215

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,114k 237k
MMBtu
$6.38
- Electrical $426k 11,650k
kWh
$0.047
- Natural Gas $429k 93k
MMBtu
$5.49

1,271

Implemented Recommendations

5.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.2k
MMBtu
1.8%
- Electrical $16k 412k
kWh
3.5%
- Natural Gas $18k -
MMBtu
-
Waste $5.3k
Productivity/Other $2.1k
TOTAL $52k