ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

235

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,055k 221k
MMBtu
$6.72
- Electrical $405k 10,923k
kWh
$0.049
- Natural Gas $403k 88k
MMBtu
$5.75

2,397

Recommendations

10.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $138k 11k
MMBtu
4.9%
- Electrical $42k 1,061k
kWh
9.7%
- Natural Gas $68k -
MMBtu
-
Waste $11k
Productivity/Other $26k
TOTAL $175k
*May be negative reflecting an increased cost component required to save energy and costs overall

229

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,073k 226k
MMBtu
$6.61
- Electrical $412k 11,142k
kWh
$0.049
- Natural Gas $411k 89k
MMBtu
$5.71

1,358

Implemented Recommendations

5.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
1.8%
- Electrical $16k 397k
kWh
3.6%
- Natural Gas $17k -
MMBtu
-
Waste $4.9k
Productivity/Other $1.9k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall