ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

230

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,070k 225k
MMBtu
$6.62
- Electrical $411k 11,115k
kWh
$0.049
- Natural Gas $410k 89k
MMBtu
$5.71

2,349

Recommendations

10.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $140k 11k
MMBtu
4.9%
- Electrical $42k 1,075k
kWh
9.7%
- Natural Gas $70k -
MMBtu
-
Waste $11k
Productivity/Other $27k
TOTAL $177k
*May be negative reflecting an increased cost component required to save energy and costs overall

219

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,099k 233k
MMBtu
$6.45
- Electrical $421k 11,485k
kWh
$0.048
- Natural Gas $423k 92k
MMBtu
$5.55

1,298

Implemented Recommendations

5.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.2k
MMBtu
1.8%
- Electrical $16k 407k
kWh
3.5%
- Natural Gas $18k -
MMBtu
-
Waste $5.2k
Productivity/Other $2.1k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall