ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

324

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $972k 219k
MMBtu
$6.49
- Electrical $546k 13,273k
kWh
$0.052
- Natural Gas $291k 61k
MMBtu
$5.60

1,801

Recommendations

5.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 8.0k
MMBtu
3.6%
- Electrical $39k 777k
kWh
5.9%
- Natural Gas $34k -
MMBtu
-
Waste $11k
Productivity/Other $69k
TOTAL $163k
*May be negative reflecting an increased cost component required to save energy and costs overall

316

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $968k 219k
MMBtu
$6.43
- Electrical $543k 13,303k
kWh
$0.052
- Natural Gas $290k 60k
MMBtu
$5.53

848

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.4k
MMBtu
1.5%
- Electrical $16k 328k
kWh
2.5%
- Natural Gas $10k -
MMBtu
-
Waste $8.7k
Productivity/Other $25k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall