ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

334

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $956k 214k
MMBtu
$6.64
- Electrical $538k 12,965k
kWh
$0.053
- Natural Gas $285k 59k
MMBtu
$5.73

1,839

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 7.9k
MMBtu
3.7%
- Electrical $39k 773k
kWh
6.0%
- Natural Gas $34k -
MMBtu
-
Waste $11k
Productivity/Other $65k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

324

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $971k 219k
MMBtu
$6.50
- Electrical $546k 13,261k
kWh
$0.052
- Natural Gas $291k 61k
MMBtu
$5.62

885

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.5k
MMBtu
1.6%
- Electrical $18k 343k
kWh
2.6%
- Natural Gas $12k -
MMBtu
-
Waste $8.5k
Productivity/Other $25k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall