ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

331

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $960k 216k
MMBtu
$6.59
- Electrical $540k 13,054k
kWh
$0.053
- Natural Gas $286k 60k
MMBtu
$5.66

1,826

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 7.9k
MMBtu
3.7%
- Electrical $39k 773k
kWh
5.9%
- Natural Gas $34k -
MMBtu
-
Waste $11k
Productivity/Other $98k
TOTAL $192k
*May be negative reflecting an increased cost component required to save energy and costs overall

320

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $975k 221k
MMBtu
$6.46
- Electrical $547k 13,355k
kWh
$0.052
- Natural Gas $293k 61k
MMBtu
$5.61

865

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.4k
MMBtu
1.6%
- Electrical $17k 336k
kWh
2.5%
- Natural Gas $11k -
MMBtu
-
Waste $8.6k
Productivity/Other $26k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall