ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

316

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $968k 219k
MMBtu
$6.43
- Electrical $543k 13,303k
kWh
$0.052
- Natural Gas $290k 60k
MMBtu
$5.53

1,756

Recommendations

5.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 7.9k
MMBtu
3.6%
- Electrical $38k 771k
kWh
5.8%
- Natural Gas $33k -
MMBtu
-
Waste $11k
Productivity/Other $68k
TOTAL $161k
*May be negative reflecting an increased cost component required to save energy and costs overall

304

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $970k 223k
MMBtu
$6.34
- Electrical $542k 13,477k
kWh
$0.051
- Natural Gas $298k 62k
MMBtu
$5.44

781

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.0k
MMBtu
1.3%
- Electrical $13k 289k
kWh
2.1%
- Natural Gas $9.1k -
MMBtu
-
Waste $5.7k
Productivity/Other $21k
TOTAL $52k