ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $846k 115k
MMBtu
$9.32
- Electrical $406k 6,359k
kWh
$0.071
- Natural Gas $16k 2.8k
MMBtu
$0.98

294

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 7.9k
MMBtu
6.9%
- Electrical $55k 774k
kWh
12.2%
- Natural Gas $1.7k -
MMBtu
-
Waste $3.9k
Productivity/Other $9.9k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

41

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $846k 115k
MMBtu
$9.32
- Electrical $406k 6,359k
kWh
$0.071
- Natural Gas $16k 2.8k
MMBtu
$0.98

179

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 1.4k
MMBtu
1.2%
- Electrical $13k 140k
kWh
2.2%
- Natural Gas ($-0.2)k -
MMBtu
-
Waste $1.6k
Productivity/Other $11k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall