ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

347

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $748k 140k
MMBtu
$6.28
- Electrical $339k 9,473k
kWh
$0.046
- Natural Gas $150k 24k
MMBtu
$4.98

2,508

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 7.3k
MMBtu
5.2%
- Electrical $33k 717k
kWh
7.6%
- Natural Gas $26k -
MMBtu
-
Waste $5.0k
Productivity/Other $52k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

341

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $733k 139k
MMBtu
$6.23
- Electrical $324k 9,373k
kWh
$0.046
- Natural Gas $150k 24k
MMBtu
$4.97

1,184

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.4k
MMBtu
2.4%
- Electrical $14k 331k
kWh
3.5%
- Natural Gas $9.3k -
MMBtu
-
Waste $3.0k
Productivity/Other $20k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall