ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

277

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $903k 236k
MMBtu
$7.25
- Electrical $343k 10,749k
kWh
$0.040
- Natural Gas $242k 53k
MMBtu
$5.68

1,749

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 31k
MMBtu
12.9%
- Electrical $102k 2,980k
kWh
27.7%
- Natural Gas $10k -
MMBtu
-
Waste $6.0k
Productivity/Other $48k
TOTAL $188k
*May be negative reflecting an increased cost component required to save energy and costs overall

258

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $947k 251k
MMBtu
$7.12
- Electrical $360k 11,353k
kWh
$0.039
- Natural Gas $255k 56k
MMBtu
$5.63

728

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.2k
MMBtu
1.3%
- Electrical $14k 314k
kWh
2.8%
- Natural Gas $4.7k -
MMBtu
-
Waste $4.6k
Productivity/Other $11k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall