ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

273

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $908k 239k
MMBtu
$7.23
- Electrical $345k 10,837k
kWh
$0.040
- Natural Gas $244k 53k
MMBtu
$5.67

1,729

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $135k 31k
MMBtu
12.9%
- Electrical $104k 3,008k
kWh
27.8%
- Natural Gas $11k -
MMBtu
-
Waste $6.1k
Productivity/Other $48k
TOTAL $189k
*May be negative reflecting an increased cost component required to save energy and costs overall

252

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $963k 256k
MMBtu
$6.97
- Electrical $368k 11,598k
kWh
$0.039
- Natural Gas $260k 57k
MMBtu
$5.57

703

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.3k
MMBtu
1.3%
- Electrical $14k 319k
kWh
2.8%
- Natural Gas $5.0k -
MMBtu
-
Waste $4.7k
Productivity/Other $11k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall