ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

285

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $903k 232k
MMBtu
$7.33
- Electrical $343k 10,683k
kWh
$0.040
- Natural Gas $238k 52k
MMBtu
$5.75

1,807

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $135k 30k
MMBtu
13.1%
- Electrical $102k 2,968k
kWh
27.8%
- Natural Gas $11k -
MMBtu
-
Waste $5.9k
Productivity/Other $47k
TOTAL $188k
*May be negative reflecting an increased cost component required to save energy and costs overall

271

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $912k 240k
MMBtu
$7.23
- Electrical $347k 10,901k
kWh
$0.040
- Natural Gas $245k 54k
MMBtu
$5.69

759

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.1k
MMBtu
1.3%
- Electrical $14k 307k
kWh
2.8%
- Natural Gas $4.5k -
MMBtu
-
Waste $4.4k
Productivity/Other $11k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall