ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

256

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $952k 253k
MMBtu
$7.04
- Electrical $363k 11,437k
kWh
$0.039
- Natural Gas $257k 57k
MMBtu
$5.59

1,632

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $140k 33k
MMBtu
12.9%
- Electrical $109k 3,176k
kWh
27.8%
- Natural Gas $10k -
MMBtu
-
Waste $6.5k
Productivity/Other $51k
TOTAL $197k
*May be negative reflecting an increased cost component required to save energy and costs overall

243

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $902k 250k
MMBtu
$6.91
- Electrical $349k 11,347k
kWh
$0.038
- Natural Gas $227k 50k
MMBtu
$5.51

658

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.2k
MMBtu
1.3%
- Electrical $14k 316k
kWh
2.8%
- Natural Gas $4.8k -
MMBtu
-
Waste $4.9k
Productivity/Other $11k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall