Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

266

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $927k 244k
MMBtu
$7.19
- Electrical $353k 11,084k
kWh
$0.040
- Natural Gas $250k 55k
MMBtu
$5.68

1,695

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $137k 32k
MMBtu
12.9%
- Electrical $106k 3,081k
kWh
27.8%
- Natural Gas $11k -
MMBtu
-
Waste $6.3k
Productivity/Other $50k
TOTAL $193k
*May be negative reflecting an increased cost component required to save energy and costs overall

250

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $968k 258k
MMBtu
$6.93
- Electrical $370k 11,685k
kWh
$0.039
- Natural Gas $261k 58k
MMBtu
$5.54

686

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.3k
MMBtu
1.3%
- Electrical $14k 322k
kWh
2.8%
- Natural Gas $4.9k -
MMBtu
-
Waste $4.7k
Productivity/Other $11k
TOTAL $46k