ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

290

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $896k 229k
MMBtu
$7.36
- Electrical $341k 10,593k
kWh
$0.040
- Natural Gas $235k 51k
MMBtu
$5.78

1,832

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 30k
MMBtu
13.1%
- Electrical $101k 2,926k
kWh
27.6%
- Natural Gas $11k -
MMBtu
-
Waste $5.8k
Productivity/Other $46k
TOTAL $186k
*May be negative reflecting an increased cost component required to save energy and costs overall

275

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $909k 238k
MMBtu
$7.25
- Electrical $345k 10,823k
kWh
$0.040
- Natural Gas $243k 53k
MMBtu
$5.70

771

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.2k
MMBtu
1.3%
- Electrical $14k 311k
kWh
2.9%
- Natural Gas $4.6k -
MMBtu
-
Waste $4.3k
Productivity/Other $11k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall