ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

288

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $894k 230k
MMBtu
$7.34
- Electrical $340k 10,579k
kWh
$0.040
- Natural Gas $236k 51k
MMBtu
$5.77

1,818

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 30k
MMBtu
13.1%
- Electrical $101k 2,937k
kWh
27.8%
- Natural Gas $11k -
MMBtu
-
Waste $5.9k
Productivity/Other $46k
TOTAL $186k
*May be negative reflecting an increased cost component required to save energy and costs overall

274

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $910k 238k
MMBtu
$7.24
- Electrical $346k 10,850k
kWh
$0.040
- Natural Gas $244k 53k
MMBtu
$5.70

765

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.1k
MMBtu
1.3%
- Electrical $14k 305k
kWh
2.8%
- Natural Gas $4.6k -
MMBtu
-
Waste $4.3k
Productivity/Other $11k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall