ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

1,377

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $714k 137k
MMBtu
$7.07
- Electrical $376k 7,863k
kWh
$0.15
- Natural Gas $223k 52k
MMBtu
$4.97

9,981

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.2k
MMBtu
4.5%
- Electrical $34k 607k
kWh
7.7%
- Natural Gas $13k -
MMBtu
-
Waste $8.6k
Productivity/Other $50k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,288

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $733k 143k
MMBtu
$6.89
- Electrical $383k 8,076k
kWh
$0.16
- Natural Gas $234k 55k
MMBtu
$4.74

5,405

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.1k
MMBtu
2.1%
- Electrical $17k 298k
kWh
3.7%
- Natural Gas $7.3k -
MMBtu
-
Waste $3.7k
Productivity/Other $18k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall