ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

1,344

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $714k 138k
MMBtu
$7.02
- Electrical $373k 7,849k
kWh
$0.16
- Natural Gas $226k 53k
MMBtu
$4.86

9,786

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.3k
MMBtu
4.6%
- Electrical $34k 617k
kWh
7.9%
- Natural Gas $13k -
MMBtu
-
Waste $8.8k
Productivity/Other $49k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,262

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $734k 143k
MMBtu
$6.85
- Electrical $384k 8,106k
kWh
$0.16
- Natural Gas $236k 55k
MMBtu
$4.36

5,341

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.1k
MMBtu
2.2%
- Electrical $18k 301k
kWh
3.7%
- Natural Gas $7.2k -
MMBtu
-
Waste $3.8k
Productivity/Other $17k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall