ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

717

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $884k 169k
MMBtu
$6.43
- Electrical $470k 10,387k
kWh
$0.056
- Natural Gas $191k 40k
MMBtu
$5.81

4,789

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 7.3k
MMBtu
4.3%
- Electrical $38k 702k
kWh
6.8%
- Natural Gas $14k -
MMBtu
-
Waste $32k
Productivity/Other $24k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall

702

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $867k 168k
MMBtu
$6.38
- Electrical $465k 10,355k
kWh
$0.056
- Natural Gas $183k 39k
MMBtu
$5.75

2,075

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.6k
MMBtu
2.1%
- Electrical $17k 344k
kWh
3.3%
- Natural Gas $5.3k -
MMBtu
-
Waste $5.6k
Productivity/Other $13k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall