ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.

59

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $266k 63k
MMBtu
$5.99
- Electrical $149k 3,536k
kWh
$0.046
- Natural Gas $47k 11k
MMBtu
$4.09

396

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.6k
MMBtu
4.1%
- Electrical $13k 252k
kWh
7.1%
- Natural Gas $4.7k -
MMBtu
-
Waste $1.6k
Productivity/Other $59k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall

58

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $265k 63k
MMBtu
$5.97
- Electrical $150k 3,563k
kWh
$0.047
- Natural Gas $45k 11k
MMBtu
$4.06

186

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 1.5k
MMBtu
2.4%
- Electrical $6.4k 145k
kWh
4.1%
- Natural Gas $1.2k -
MMBtu
-
Waste $0.4k
Productivity/Other $27k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall