ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Boiler, tank, and shipping container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $336k 48k
MMBtu
$6.96
- Electrical $236k 4,316k
kWh
$0.053
- Natural Gas $35k 3.7k
MMBtu
$10.04

12

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 8.3k
MMBtu
17.4%
- Electrical $37k 814k
kWh
18.9%
- Natural Gas $3.0k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $278k 42k
MMBtu
$6.61
- Electrical $143k 3,602k
kWh
$0.040
- Natural Gas $45k 5.2k
MMBtu
$8.60

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.7k 1.7k
MMBtu
4.0%
- Electrical $6.5k 164k
kWh
4.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $7.7k
*May be negative reflecting an increased cost component required to save energy and costs overall