ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

191

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $864k 345k
MMBtu
$5.96
- Electrical $552k 12,867k
kWh
$0.050
- Natural Gas $151k 202k
MMBtu
$5.59

1,250

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 13k
MMBtu
3.8%
- Electrical $59k 1,275k
kWh
9.9%
- Natural Gas $7.2k -
MMBtu
-
Waste $5.7k
Productivity/Other $24k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

167

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $882k 376k
MMBtu
$5.79
- Electrical $566k 13,395k
kWh
$0.049
- Natural Gas $161k 226k
MMBtu
$5.33

533

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 5.8k
MMBtu
1.6%
- Electrical $24k 570k
kWh
4.3%
- Natural Gas $4.2k -
MMBtu
-
Waste $1.7k
Productivity/Other $8.0k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall