ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

82

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,354k 143k
MMBtu
$21.15
- Electrical $1,014k 5,621k
kWh
$0.19
- Natural Gas $3.2k 0.3k
MMBtu
$0.15

679

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $252k 12k
MMBtu
8.4%
- Electrical $207k 1,178k
kWh
21.0%
- Natural Gas ($-9.4)k -
MMBtu
-
Waste $1.1k
Productivity/Other $9.8k
TOTAL $263k
*May be negative reflecting an increased cost component required to save energy and costs overall

73

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,292k 148k
MMBtu
$20.71
- Electrical $1,031k 5,817k
kWh
$0.19
- Natural Gas $3.6k 0.3k
MMBtu
$0.16

362

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $128k 6.3k
MMBtu
4.2%
- Electrical $107k 613k
kWh
10.5%
- Natural Gas -
-
MMBtu
-
Waste $0.0k
Productivity/Other $6.8k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall