ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

75

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,275k 145k
MMBtu
$20.77
- Electrical $1,019k 5,736k
kWh
$0.19
- Natural Gas $3.5k 0.3k
MMBtu
$0.16

630

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $249k 13k
MMBtu
8.9%
- Electrical $219k 1,253k
kWh
21.8%
- Natural Gas ($-10.3)k -
MMBtu
-
Waste $1.2k
Productivity/Other $10k
TOTAL $261k
*May be negative reflecting an increased cost component required to save energy and costs overall

70

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,295k 152k
MMBtu
$20.53
- Electrical $1,031k 5,848k
kWh
$0.18
- Natural Gas $3.8k 0.3k
MMBtu
$0.17

346

Implemented Recommendations

4.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $124k 6.2k
MMBtu
4.1%
- Electrical $105k 606k
kWh
10.4%
- Natural Gas -
-
MMBtu
-
Waste $0.0k
Productivity/Other $7.1k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall