ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

79

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,385k 148k
MMBtu
$20.93
- Electrical $1,034k 5,758k
kWh
$0.19
- Natural Gas $3.3k 0.3k
MMBtu
$0.15

659

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $260k 12k
MMBtu
8.5%
- Electrical $214k 1,219k
kWh
21.2%
- Natural Gas ($-9.8)k -
MMBtu
-
Waste $1.1k
Productivity/Other $10k
TOTAL $272k
*May be negative reflecting an increased cost component required to save energy and costs overall

72

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,308k 150k
MMBtu
$20.62
- Electrical $1,044k 5,893k
kWh
$0.18
- Natural Gas $3.7k 0.3k
MMBtu
$0.17

359

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $130k 6.4k
MMBtu
4.2%
- Electrical $108k 621k
kWh
10.5%
- Natural Gas -
-
MMBtu
-
Waste $0.0k
Productivity/Other $6.9k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall