ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

663

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $852k 142k
MMBtu
$7.75
- Electrical $432k 7,969k
kWh
$0.066
- Natural Gas $288k 53k
MMBtu
$7.10

5,811

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $119k 12k
MMBtu
8.4%
- Electrical $69k 1,154k
kWh
14.5%
- Natural Gas $34k -
MMBtu
-
Waste $7.0k
Productivity/Other $37k
TOTAL $163k
*May be negative reflecting an increased cost component required to save energy and costs overall

646

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $847k 141k
MMBtu
$7.73
- Electrical $426k 7,934k
kWh
$0.066
- Natural Gas $289k 52k
MMBtu
$7.15

2,666

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
2.9%
- Electrical $23k 397k
kWh
5.0%
- Natural Gas $15k -
MMBtu
-
Waste $1.8k
Productivity/Other $7.3k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall