ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

599

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $801k 218k
MMBtu
$5.44
- Electrical $446k 10,429k
kWh
$0.083
- Natural Gas $193k 58k
MMBtu
$4.31

3,596

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 9.5k
MMBtu
4.4%
- Electrical $46k 931k
kWh
8.9%
- Natural Gas $10k -
MMBtu
-
Waste $12k
Productivity/Other $122k
TOTAL $209k
*May be negative reflecting an increased cost component required to save energy and costs overall

580

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $793k 221k
MMBtu
$5.30
- Electrical $443k 10,489k
kWh
$0.083
- Natural Gas $195k 59k
MMBtu
$4.20

1,721

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.3k
MMBtu
1.5%
- Electrical $15k 319k
kWh
3.0%
- Natural Gas $5.3k -
MMBtu
-
Waste $5.1k
Productivity/Other $43k
TOTAL $76k