ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

864

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $527k 128k
MMBtu
$5.39
- Electrical $296k 7,348k
kWh
$0.061
- Natural Gas $168k 50k
MMBtu
$4.38

5,838

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 8.8k
MMBtu
6.9%
- Electrical $37k 855k
kWh
11.6%
- Natural Gas $13k -
MMBtu
-
Waste $7.1k
Productivity/Other $48k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

850

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $533k 129k
MMBtu
$5.32
- Electrical $299k 7,441k
kWh
$0.060
- Natural Gas $171k 51k
MMBtu
$4.35

2,652

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.3k
MMBtu
1.8%
- Electrical $10k 228k
kWh
3.1%
- Natural Gas $5.0k -
MMBtu
-
Waste $2.7k
Productivity/Other $7.5k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall