ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

1,289

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $656k 114k
MMBtu
$6.77
- Electrical $344k 6,983k
kWh
$0.059
- Natural Gas $203k 38k
MMBtu
$6.91

10,123

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 7.3k
MMBtu
6.4%
- Electrical $40k 711k
kWh
10.2%
- Natural Gas $27k -
MMBtu
-
Waste $8.8k
Productivity/Other $43k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,250

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $653k 114k
MMBtu
$6.70
- Electrical $339k 6,952k
kWh
$0.058
- Natural Gas $207k 39k
MMBtu
$6.91

4,704

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.1k
MMBtu
2.7%
- Electrical $15k 302k
kWh
4.3%
- Natural Gas $7.9k -
MMBtu
-
Waste $2.9k
Productivity/Other $16k
TOTAL $49k