ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

638

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $820k 152k
MMBtu
$8.99
- Electrical $409k 7,376k
kWh
$0.072
- Natural Gas $254k 46k
MMBtu
$6.50

5,153

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 4.8k
MMBtu
3.1%
- Electrical $30k 466k
kWh
6.3%
- Natural Gas $24k -
MMBtu
-
Waste $6.3k
Productivity/Other $33k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall

607

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $829k 155k
MMBtu
$8.93
- Electrical $412k 7,431k
kWh
$0.073
- Natural Gas $261k 47k
MMBtu
$6.50

2,287

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 1.8k
MMBtu
1.1%
- Electrical $11k 172k
kWh
2.3%
- Natural Gas $11k -
MMBtu
-
Waste $1.8k
Productivity/Other $12k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall