ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

664

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $822k 150k
MMBtu
$9.08
- Electrical $409k 7,344k
kWh
$0.072
- Natural Gas $252k 45k
MMBtu
$6.53

5,420

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 4.9k
MMBtu
3.2%
- Electrical $30k 474k
kWh
6.5%
- Natural Gas $24k -
MMBtu
-
Waste $6.1k
Productivity/Other $34k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall

636

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $822k 152k
MMBtu
$8.97
- Electrical $409k 7,379k
kWh
$0.072
- Natural Gas $255k 46k
MMBtu
$6.47

2,373

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 1.7k
MMBtu
1.1%
- Electrical $11k 167k
kWh
2.3%
- Natural Gas $10k -
MMBtu
-
Waste $1.7k
Productivity/Other $12k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall