ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

141

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,581k 298k
MMBtu
$7.06
- Electrical $890k 18,707k
kWh
$0.057
- Natural Gas $191k 62k
MMBtu
$4.80

1,005

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 20k
MMBtu
6.8%
- Electrical $107k 1,979k
kWh
10.6%
- Natural Gas $6.8k -
MMBtu
-
Waste $4.3k
Productivity/Other $54k
TOTAL $193k
*May be negative reflecting an increased cost component required to save energy and costs overall

137

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,613k 306k
MMBtu
$6.85
- Electrical $913k 19,211k
kWh
$0.056
- Natural Gas $197k 64k
MMBtu
$4.73

418

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.5k
MMBtu
0.8%
- Electrical $11k 244k
kWh
1.3%
- Natural Gas $1.2k -
MMBtu
-
Waste $1.5k
Productivity/Other $14k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall