ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

382

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $674k 81k
MMBtu
$9.38
- Electrical $394k 4,423k
kWh
$0.098
- Natural Gas $204k 33k
MMBtu
$6.57

2,895

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 5.9k
MMBtu
7.3%
- Electrical $55k 579k
kWh
13.1%
- Natural Gas $20k -
MMBtu
-
Waste $1.5k
Productivity/Other $13k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

370

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $646k 77k
MMBtu
$9.39
- Electrical $381k 4,278k
kWh
$0.097
- Natural Gas $192k 30k
MMBtu
$6.55

1,296

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 1.7k
MMBtu
2.1%
- Electrical $15k 161k
kWh
3.8%
- Natural Gas $10k -
MMBtu
-
Waste $0.6k
Productivity/Other $6.2k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall