ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

125

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $988k 133k
MMBtu
$9.34
- Electrical $576k 7,338k
kWh
$0.087
- Natural Gas $166k 27k
MMBtu
$3.80

894

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $123k 13k
MMBtu
9.6%
- Electrical $103k 1,254k
kWh
17.1%
- Natural Gas ($-37.8)k -
MMBtu
-
Waste $1.8k
Productivity/Other $12k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall

124

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $971k 132k
MMBtu
$9.34
- Electrical $569k 7,269k
kWh
$0.087
- Natural Gas $159k 26k
MMBtu
$3.77

407

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 2.1k
MMBtu
1.6%
- Electrical $17k 206k
kWh
2.8%
- Natural Gas ($-13.8)k -
MMBtu
-
Waste $0.8k
Productivity/Other $4.8k
TOTAL $40k