ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,147k 107k
MMBtu
$12.32
- Electrical $620k 6,952k
kWh
$0.098
- Natural Gas $38k 3.1k
MMBtu
$4.10

21

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $89k 2.1k
MMBtu
1.9%
- Electrical $20k 203k
kWh
2.9%
- Natural Gas $2.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,469k 146k
MMBtu
$10.25
- Electrical $745k 8,964k
kWh
$0.085
- Natural Gas $57k 4.6k
MMBtu
$6.14

9

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 0.8k
MMBtu
0.5%
- Electrical $6.9k 78k
kWh
0.9%
- Natural Gas $5.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall