ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

212

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $633k 128k
MMBtu
$6.44
- Electrical $257k 6,760k
kWh
$0.047
- Natural Gas $183k 44k
MMBtu
$4.98

1,540

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 8.0k
MMBtu
6.2%
- Electrical $30k 778k
kWh
11.5%
- Natural Gas $9.4k -
MMBtu
-
Waste $4.6k
Productivity/Other $59k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

196

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $619k 129k
MMBtu
$6.32
- Electrical $251k 6,734k
kWh
$0.046
- Natural Gas $180k 43k
MMBtu
$4.89

778

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.6k
MMBtu
2.8%
- Electrical $14k 352k
kWh
5.2%
- Natural Gas $4.9k -
MMBtu
-
Waste $2.1k
Productivity/Other $23k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall