ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

199

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $635k 131k
MMBtu
$6.34
- Electrical $259k 6,940k
kWh
$0.046
- Natural Gas $182k 43k
MMBtu
$4.94

1,468

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 8.0k
MMBtu
6.1%
- Electrical $29k 785k
kWh
11.3%
- Natural Gas $9.5k -
MMBtu
-
Waste $4.3k
Productivity/Other $47k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

187

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $628k 133k
MMBtu
$6.19
- Electrical $254k 6,880k
kWh
$0.046
- Natural Gas $185k 45k
MMBtu
$4.75

757

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.7k
MMBtu
2.8%
- Electrical $14k 358k
kWh
5.2%
- Natural Gas $5.1k -
MMBtu
-
Waste $2.2k
Productivity/Other $23k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall