ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $931k 174k
MMBtu
$5.64
- Electrical $460k 12,898k
kWh
$0.035
- Natural Gas $286k 41k
MMBtu
$6.45

67

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 11k
MMBtu
6.4%
- Electrical $32k 1,091k
kWh
8.5%
- Natural Gas $12k -
MMBtu
-
Waste $4.3k
Productivity/Other $9.1k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $922k 176k
MMBtu
$5.55
- Electrical $452k 12,875k
kWh
$0.035
- Natural Gas $306k 43k
MMBtu
$6.63

26

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.6k
MMBtu
1.5%
- Electrical $5.2k 251k
kWh
1.9%
- Natural Gas $13k -
MMBtu
-
Waste $0.1k
Productivity/Other $6.5k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall