ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

447

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,401k 289k
MMBtu
$7.14
- Electrical $541k 13,480k
kWh
$0.054
- Natural Gas $582k 138k
MMBtu
$6.58

2,698

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 16k
MMBtu
5.6%
- Electrical $67k 1,568k
kWh
11.6%
- Natural Gas $11k -
MMBtu
-
Waste $3.5k
Productivity/Other $14k
TOTAL $128k
*May be negative reflecting an increased cost component required to save energy and costs overall

423

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,448k 302k
MMBtu
$6.91
- Electrical $554k 13,982k
kWh
$0.052
- Natural Gas $611k 145k
MMBtu
$6.58

964

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.3k
MMBtu
0.8%
- Electrical $10k 221k
kWh
1.6%
- Natural Gas $9.2k -
MMBtu
-
Waste $1.2k
Productivity/Other $6.5k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall