ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

453

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,401k 287k
MMBtu
$7.30
- Electrical $544k 13,442k
kWh
$0.055
- Natural Gas $578k 137k
MMBtu
$6.56

2,732

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 17k
MMBtu
6.1%
- Electrical $74k 1,698k
kWh
12.6%
- Natural Gas $9.7k -
MMBtu
-
Waste $3.4k
Productivity/Other $15k
TOTAL $140k
*May be negative reflecting an increased cost component required to save energy and costs overall

428

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,444k 299k
MMBtu
$6.93
- Electrical $556k 13,941k
kWh
$0.052
- Natural Gas $605k 144k
MMBtu
$6.62

974

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.3k
MMBtu
0.8%
- Electrical $10k 221k
kWh
1.6%
- Natural Gas $9.3k -
MMBtu
-
Waste $1.2k
Productivity/Other $6.5k
TOTAL $32k