ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

437

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,421k 294k
MMBtu
$7.07
- Electrical $547k 13,691k
kWh
$0.053
- Natural Gas $594k 141k
MMBtu
$6.58

2,652

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 16k
MMBtu
5.5%
- Electrical $67k 1,577k
kWh
11.5%
- Natural Gas $11k -
MMBtu
-
Waste $3.6k
Productivity/Other $14k
TOTAL $128k
*May be negative reflecting an increased cost component required to save energy and costs overall

404

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,471k 310k
MMBtu
$6.74
- Electrical $551k 14,151k
kWh
$0.051
- Natural Gas $635k 151k
MMBtu
$6.38

953

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.3k
MMBtu
0.8%
- Electrical $11k 229k
kWh
1.6%
- Natural Gas $9.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $6.7k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall