ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

748

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $611k 118k
MMBtu
$6.42
- Electrical $375k 7,185k
kWh
$0.061
- Natural Gas $137k 34k
MMBtu
$4.95

5,649

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 7.3k
MMBtu
6.2%
- Electrical $38k 713k
kWh
9.9%
- Natural Gas $11k -
MMBtu
-
Waste $11k
Productivity/Other $30k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

732

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $598k 117k
MMBtu
$6.37
- Electrical $369k 7,121k
kWh
$0.060
- Natural Gas $132k 34k
MMBtu
$4.85

3,142

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.2k
MMBtu
2.7%
- Electrical $17k 309k
kWh
4.3%
- Natural Gas $4.9k -
MMBtu
-
Waste $3.0k
Productivity/Other $5.4k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall