ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $673k 111k
MMBtu
$5.89
- Electrical $372k 9,440k
kWh
$0.037
- Natural Gas $79k 14k
MMBtu
$6.03

33

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.5k
MMBtu
3.2%
- Electrical $13k 346k
kWh
3.7%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $673k 111k
MMBtu
$5.89
- Electrical $372k 9,440k
kWh
$0.037
- Natural Gas $79k 14k
MMBtu
$6.03

19

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.8k
MMBtu
1.6%
- Electrical $6.8k 173k
kWh
1.8%
- Natural Gas $7.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall