ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

653

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $920k 176k
MMBtu
$7.89
- Electrical $447k 9,584k
kWh
$0.064
- Natural Gas $277k 58k
MMBtu
$5.82

4,481

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 9.4k
MMBtu
5.3%
- Electrical $36k 916k
kWh
9.6%
- Natural Gas $32k -
MMBtu
-
Waste $7.3k
Productivity/Other $25k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

612

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $939k 182k
MMBtu
$7.80
- Electrical $452k 9,842k
kWh
$0.063
- Natural Gas $288k 60k
MMBtu
$5.80

1,728

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.1k
MMBtu
1.1%
- Electrical $8.3k 202k
kWh
2.1%
- Natural Gas $8.3k -
MMBtu
-
Waste $2.4k
Productivity/Other $8.7k
TOTAL $33k