ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

663

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $912k 174k
MMBtu
$7.94
- Electrical $444k 9,480k
kWh
$0.064
- Natural Gas $273k 57k
MMBtu
$5.84

4,580

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 9.3k
MMBtu
5.3%
- Electrical $35k 905k
kWh
9.5%
- Natural Gas $32k -
MMBtu
-
Waste $7.2k
Productivity/Other $25k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall

634

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $934k 179k
MMBtu
$7.89
- Electrical $451k 9,736k
kWh
$0.063
- Natural Gas $283k 59k
MMBtu
$5.79

1,827

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.2k
MMBtu
1.2%
- Electrical $9.2k 215k
kWh
2.2%
- Natural Gas $8.1k -
MMBtu
-
Waste $2.4k
Productivity/Other $8.9k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall