ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,099k 415k
MMBtu
$8.20
- Electrical $2,133k 32,499k
kWh
$0.075
- Natural Gas $412k 46k
MMBtu
$7.99

16

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 11k
MMBtu
2.6%
- Electrical $64k 1,064k
kWh
3.3%
- Natural Gas $21k -
MMBtu
-
Waste -
Productivity/Other $11k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,099k 415k
MMBtu
$8.20
- Electrical $2,133k 32,499k
kWh
$0.075
- Natural Gas $412k 46k
MMBtu
$7.99

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.4k
MMBtu
0.6%
- Electrical $19k 236k
kWh
0.7%
- Natural Gas $2.7k -
MMBtu
-
Waste -
Productivity/Other $13k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall