ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

117

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,137k 172k
MMBtu
$8.06
- Electrical $578k 8,725k
kWh
$0.077
- Natural Gas $445k 76k
MMBtu
$6.52

1,011

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $117k 11k
MMBtu
6.3%
- Electrical $74k 1,066k
kWh
12.2%
- Natural Gas $32k -
MMBtu
-
Waste $21k
Productivity/Other $6.6k
TOTAL $145k
*May be negative reflecting an increased cost component required to save energy and costs overall

112

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,167k 178k
MMBtu
$7.91
- Electrical $591k 8,973k
kWh
$0.076
- Natural Gas $460k 79k
MMBtu
$6.52

457

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.7k
MMBtu
2.1%
- Electrical $25k 361k
kWh
4.0%
- Natural Gas $5.7k -
MMBtu
-
Waste $3.5k
Productivity/Other $1.8k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall