ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

475

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $701k 83k
MMBtu
$9.86
- Electrical $406k 4,653k
kWh
$0.094
- Natural Gas $146k 20k
MMBtu
$6.42

2,999

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 5.4k
MMBtu
6.5%
- Electrical $49k 530k
kWh
11.4%
- Natural Gas $15k -
MMBtu
-
Waste $4.8k
Productivity/Other $11k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

463

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $705k 84k
MMBtu
$9.64
- Electrical $407k 4,699k
kWh
$0.092
- Natural Gas $147k 20k
MMBtu
$6.31

1,427

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 1.7k
MMBtu
2.1%
- Electrical $16k 169k
kWh
3.6%
- Natural Gas $3.3k -
MMBtu
-
Waste $1.2k
Productivity/Other $1.8k
TOTAL $34k