ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

550

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,738k 310k
MMBtu
$8.28
- Electrical $769k 13,616k
kWh
$0.076
- Natural Gas $817k 152k
MMBtu
$4.50

3,476

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $201k 14k
MMBtu
4.4%
- Electrical $78k 1,322k
kWh
9.7%
- Natural Gas $107k -
MMBtu
-
Waste $6.5k
Productivity/Other $24k
TOTAL $232k
*May be negative reflecting an increased cost component required to save energy and costs overall

508

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,816k 326k
MMBtu
$8.04
- Electrical $785k 14,075k
kWh
$0.075
- Natural Gas $875k 162k
MMBtu
$4.44

1,691

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 5.0k
MMBtu
1.5%
- Electrical $31k 483k
kWh
3.4%
- Natural Gas $30k -
MMBtu
-
Waste $2.0k
Productivity/Other $6.0k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall