ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

512

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,821k 327k
MMBtu
$8.06
- Electrical $789k 14,095k
kWh
$0.075
- Natural Gas $874k 162k
MMBtu
$4.45

3,299

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $212k 14k
MMBtu
4.3%
- Electrical $81k 1,385k
kWh
9.8%
- Natural Gas $115k -
MMBtu
-
Waste $6.7k
Productivity/Other $24k
TOTAL $243k
*May be negative reflecting an increased cost component required to save energy and costs overall

462

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,917k 347k
MMBtu
$7.72
- Electrical $814k 14,789k
kWh
$0.073
- Natural Gas $945k 174k
MMBtu
$4.62

1,586

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 4.7k
MMBtu
1.4%
- Electrical $29k 461k
kWh
3.1%
- Natural Gas $33k -
MMBtu
-
Waste $0.9k
Productivity/Other $6.0k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall