ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

582

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,668k 297k
MMBtu
$8.53
- Electrical $738k 13,039k
kWh
$0.077
- Natural Gas $775k 144k
MMBtu
$4.52

3,612

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $193k 13k
MMBtu
4.4%
- Electrical $76k 1,275k
kWh
9.8%
- Natural Gas $102k -
MMBtu
-
Waste $6.6k
Productivity/Other $25k
TOTAL $224k
*May be negative reflecting an increased cost component required to save energy and costs overall

528

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,777k 319k
MMBtu
$8.14
- Electrical $780k 13,924k
kWh
$0.076
- Natural Gas $845k 157k
MMBtu
$4.39

1,749

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 4.9k
MMBtu
1.5%
- Electrical $31k 478k
kWh
3.4%
- Natural Gas $29k -
MMBtu
-
Waste $2.2k
Productivity/Other $6.6k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall