ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

569

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,705k 304k
MMBtu
$8.42
- Electrical $759k 13,422k
kWh
$0.077
- Natural Gas $792k 147k
MMBtu
$4.43

3,553

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $196k 13k
MMBtu
4.4%
- Electrical $76k 1,294k
kWh
9.6%
- Natural Gas $104k -
MMBtu
-
Waste $6.8k
Productivity/Other $24k
TOTAL $227k
*May be negative reflecting an increased cost component required to save energy and costs overall

515

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,816k 326k
MMBtu
$8.06
- Electrical $796k 14,236k
kWh
$0.075
- Natural Gas $865k 161k
MMBtu
$4.41

1,715

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 5.0k
MMBtu
1.5%
- Electrical $31k 486k
kWh
3.4%
- Natural Gas $29k -
MMBtu
-
Waste $2.2k
Productivity/Other $6.6k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall