ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

395

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $939k 187k
MMBtu
$6.63
- Electrical $434k 11,587k
kWh
$0.044
- Natural Gas $262k 61k
MMBtu
$5.59

3,033

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 10k
MMBtu
5.6%
- Electrical $44k 1,018k
kWh
8.8%
- Natural Gas $31k -
MMBtu
-
Waste $27k
Productivity/Other $49k
TOTAL $181k
*May be negative reflecting an increased cost component required to save energy and costs overall

370

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $926k 187k
MMBtu
$6.52
- Electrical $434k 11,652k
kWh
$0.044
- Natural Gas $263k 60k
MMBtu
$5.53

1,075

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.9k
MMBtu
1.6%
- Electrical $13k 286k
kWh
2.5%
- Natural Gas $8.1k -
MMBtu
-
Waste $3.3k
Productivity/Other $14k
TOTAL $45k