ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

378

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $920k 186k
MMBtu
$6.51
- Electrical $430k 11,536k
kWh
$0.044
- Natural Gas $260k 60k
MMBtu
$5.50

2,924

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 10k
MMBtu
5.4%
- Electrical $43k 979k
kWh
8.5%
- Natural Gas $31k -
MMBtu
-
Waste $28k
Productivity/Other $51k
TOTAL $182k
*May be negative reflecting an increased cost component required to save energy and costs overall

340

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $928k 192k
MMBtu
$6.23
- Electrical $445k 12,007k
kWh
$0.044
- Natural Gas $265k 61k
MMBtu
$5.30

1,059

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.2k
MMBtu
1.7%
- Electrical $14k 310k
kWh
2.6%
- Natural Gas $8.7k -
MMBtu
-
Waste $3.6k
Productivity/Other $16k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall