ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

488

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $446k 94k
MMBtu
$6.10
- Electrical $257k 5,434k
kWh
$0.058
- Natural Gas $100k 27k
MMBtu
$4.51

4,081

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 7.3k
MMBtu
7.8%
- Electrical $35k 712k
kWh
13.1%
- Natural Gas $11k -
MMBtu
-
Waste $1.9k
Productivity/Other $22k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

487

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $443k 93k
MMBtu
$6.09
- Electrical $256k 5,410k
kWh
$0.058
- Natural Gas $100k 27k
MMBtu
$4.50

1,907

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.9k
MMBtu
3.1%
- Electrical $14k 279k
kWh
5.2%
- Natural Gas $5.2k -
MMBtu
-
Waste $0.4k
Productivity/Other $9.8k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall