ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

588

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $918k 148k
MMBtu
$7.15
- Electrical $437k 9,461k
kWh
$0.056
- Natural Gas $207k 48k
MMBtu
$5.26

4,627

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 8.0k
MMBtu
5.4%
- Electrical $43k 776k
kWh
8.2%
- Natural Gas $17k -
MMBtu
-
Waste $15k
Productivity/Other $38k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

572

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $910k 148k
MMBtu
$7.10
- Electrical $428k 9,436k
kWh
$0.055
- Natural Gas $206k 48k
MMBtu
$5.25

1,888

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.5k
MMBtu
1.7%
- Electrical $12k 241k
kWh
2.6%
- Natural Gas $4.9k -
MMBtu
-
Waste $1.9k
Productivity/Other $5.7k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall