ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

140

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $788k 198k
MMBtu
$6.11
- Electrical $369k 8,620k
kWh
$0.048
- Natural Gas $270k 64k
MMBtu
$4.51

917

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 11k
MMBtu
5.4%
- Electrical $44k 1,052k
kWh
12.2%
- Natural Gas $19k -
MMBtu
-
Waste $9.3k
Productivity/Other $85k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

138

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $753k 194k
MMBtu
$6.10
- Electrical $364k 8,569k
kWh
$0.048
- Natural Gas $242k 59k
MMBtu
$4.49

287

Implemented Recommendations

2.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.6k
MMBtu
0.8%
- Electrical $6.0k 152k
kWh
1.8%
- Natural Gas $3.4k -
MMBtu
-
Waste $2.5k
Productivity/Other $41k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall