ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

419

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $817k 186k
MMBtu
$5.22
- Electrical $324k 9,178k
kWh
$0.042
- Natural Gas $352k 87k
MMBtu
$4.92

3,335

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 5.5k
MMBtu
3.0%
- Electrical $23k 538k
kWh
5.9%
- Natural Gas $15k -
MMBtu
-
Waste $4.3k
Productivity/Other $54k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

413

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $805k 185k
MMBtu
$5.19
- Electrical $320k 9,094k
kWh
$0.042
- Natural Gas $353k 87k
MMBtu
$4.93

1,690

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.5k
MMBtu
1.4%
- Electrical $9.5k 247k
kWh
2.7%
- Natural Gas $7.0k -
MMBtu
-
Waste $1.4k
Productivity/Other $9.5k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall