ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,198k 47k
MMBtu
$28.79
- Electrical $916k 4,142k
kWh
$0.23
- Natural Gas $49k 1.7k
MMBtu
$9.25

143

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $369k 13k
MMBtu
27.2%
- Electrical $304k 1,243k
kWh
30.0%
- Natural Gas $12k -
MMBtu
-
Waste $1.1k
Productivity/Other $7.9k
TOTAL $378k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,379k 57k
MMBtu
$25.68
- Electrical $1,080k 5,064k
kWh
$0.20
- Natural Gas $42k 1.7k
MMBtu
$8.65

75

Implemented Recommendations

5.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $376k 13k
MMBtu
22.9%
- Electrical $298k 1,265k
kWh
25.0%
- Natural Gas $13k -
MMBtu
-
Waste -
Productivity/Other $6.6k
TOTAL $383k
*May be negative reflecting an increased cost component required to save energy and costs overall