ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

834

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $820k 175k
MMBtu
$6.23
- Electrical $477k 10,137k
kWh
$0.059
- Natural Gas $262k 61k
MMBtu
$5.79

5,667

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 11k
MMBtu
6.2%
- Electrical $60k 1,047k
kWh
10.3%
- Natural Gas $43k -
MMBtu
-
Waste $7.2k
Productivity/Other $29k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

810

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $820k 177k
MMBtu
$6.12
- Electrical $472k 10,217k
kWh
$0.058
- Natural Gas $265k 63k
MMBtu
$5.74

2,485

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.1k
MMBtu
1.7%
- Electrical $17k 300k
kWh
2.9%
- Natural Gas $15k -
MMBtu
-
Waste $1.9k
Productivity/Other $11k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall