ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

822

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $820k 176k
MMBtu
$6.18
- Electrical $475k 10,175k
kWh
$0.059
- Natural Gas $263k 62k
MMBtu
$5.76

5,573

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 11k
MMBtu
6.1%
- Electrical $58k 1,037k
kWh
10.2%
- Natural Gas $43k -
MMBtu
-
Waste $7.3k
Productivity/Other $29k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

790

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $816k 178k
MMBtu
$6.06
- Electrical $463k 10,183k
kWh
$0.057
- Natural Gas $268k 64k
MMBtu
$5.64

2,400

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.9k
MMBtu
1.7%
- Electrical $16k 287k
kWh
2.8%
- Natural Gas $15k -
MMBtu
-
Waste $1.9k
Productivity/Other $11k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall