ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $532k 55k
MMBtu
$10.59
- Electrical $286k 5,037k
kWh
$0.059
- Natural Gas $21k 3.1k
MMBtu
$2.29

250

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $122k 12k
MMBtu
22.5%
- Electrical $77k 1,204k
kWh
23.9%
- Natural Gas $5.3k -
MMBtu
-
Waste $1.4k
Productivity/Other $33k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $544k 57k
MMBtu
$10.39
- Electrical $297k 5,217k
kWh
$0.059
- Natural Gas $24k 3.5k
MMBtu
$2.05

122

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 5.8k
MMBtu
10.2%
- Electrical $40k 570k
kWh
10.9%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other $11k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall