ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

938

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $695k 114k
MMBtu
$12.33
- Electrical $418k 7,247k
kWh
$0.091
- Natural Gas $109k 26k
MMBtu
$2.54

7,759

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $151k 21k
MMBtu
18.2%
- Electrical $114k 2,020k
kWh
27.9%
- Natural Gas $0.3k -
MMBtu
-
Waste $6.6k
Productivity/Other $113k
TOTAL $271k
*May be negative reflecting an increased cost component required to save energy and costs overall

909

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $698k 116k
MMBtu
$12.34
- Electrical $419k 7,297k
kWh
$0.092
- Natural Gas $112k 27k
MMBtu
$2.53

3,686

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 7.6k
MMBtu
6.6%
- Electrical $42k 746k
kWh
10.2%
- Natural Gas $0.5k -
MMBtu
-
Waste $3.1k
Productivity/Other $39k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall