ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

944

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $693k 113k
MMBtu
$12.32
- Electrical $416k 7,221k
kWh
$0.091
- Natural Gas $109k 26k
MMBtu
$2.54

7,812

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $151k 21k
MMBtu
18.2%
- Electrical $114k 2,015k
kWh
27.9%
- Natural Gas $0.3k -
MMBtu
-
Waste $6.5k
Productivity/Other $113k
TOTAL $270k
*May be negative reflecting an increased cost component required to save energy and costs overall

923

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $694k 114k
MMBtu
$12.35
- Electrical $416k 7,231k
kWh
$0.091
- Natural Gas $111k 27k
MMBtu
$2.54

3,763

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 7.6k
MMBtu
6.7%
- Electrical $42k 745k
kWh
10.3%
- Natural Gas $0.6k -
MMBtu
-
Waste $3.1k
Productivity/Other $40k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall