ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

139

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,080k 578k
MMBtu
$9.59
- Electrical $649k 8,643k
kWh
$0.20
- Natural Gas $254k 474k
MMBtu
$7.15

1,158

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $174k 13k
MMBtu
2.2%
- Electrical $107k 1,229k
kWh
14.2%
- Natural Gas $42k -
MMBtu
-
Waste $2.4k
Productivity/Other $9.0k
TOTAL $186k
*May be negative reflecting an increased cost component required to save energy and costs overall

131

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,106k 609k
MMBtu
$9.36
- Electrical $661k 8,825k
kWh
$0.20
- Natural Gas $265k 503k
MMBtu
$7.22

476

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 5.0k
MMBtu
0.8%
- Electrical $46k 491k
kWh
5.6%
- Natural Gas $23k -
MMBtu
-
Waste $1.3k
Productivity/Other $3.7k
TOTAL $84k