ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

133

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,092k 600k
MMBtu
$9.42
- Electrical $653k 8,713k
kWh
$0.20
- Natural Gas $261k 495k
MMBtu
$7.18

1,104

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $179k 13k
MMBtu
2.2%
- Electrical $110k 1,260k
kWh
14.5%
- Natural Gas $43k -
MMBtu
-
Waste $2.5k
Productivity/Other $9.4k
TOTAL $191k
*May be negative reflecting an increased cost component required to save energy and costs overall

124

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,138k 639k
MMBtu
$9.35
- Electrical $683k 9,135k
kWh
$0.21
- Natural Gas $270k 529k
MMBtu
$7.18

463

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 5.3k
MMBtu
0.8%
- Electrical $48k 513k
kWh
5.6%
- Natural Gas $24k -
MMBtu
-
Waste $1.4k
Productivity/Other $3.6k
TOTAL $87k