ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

137

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,067k 583k
MMBtu
$9.57
- Electrical $637k 8,486k
kWh
$0.20
- Natural Gas $257k 481k
MMBtu
$7.09

1,142

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $175k 13k
MMBtu
2.2%
- Electrical $107k 1,228k
kWh
14.5%
- Natural Gas $43k -
MMBtu
-
Waste $2.4k
Productivity/Other $9.1k
TOTAL $187k
*May be negative reflecting an increased cost component required to save energy and costs overall

128

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,125k 622k
MMBtu
$9.32
- Electrical $674k 9,006k
kWh
$0.21
- Natural Gas $269k 514k
MMBtu
$7.20

470

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 5.1k
MMBtu
0.8%
- Electrical $47k 500k
kWh
5.6%
- Natural Gas $23k -
MMBtu
-
Waste $1.4k
Productivity/Other $3.8k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall