ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

226

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $556k 85k
MMBtu
$10.31
- Electrical $334k 4,105k
kWh
$0.092
- Natural Gas $110k 17k
MMBtu
$7.12

1,566

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 5.7k
MMBtu
6.7%
- Electrical $47k 553k
kWh
13.5%
- Natural Gas $15k -
MMBtu
-
Waste $1.2k
Productivity/Other $7.8k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

216

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 87k
MMBtu
$9.92
- Electrical $335k 4,182k
kWh
$0.090
- Natural Gas $109k 17k
MMBtu
$6.91

695

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.4k
MMBtu
1.6%
- Electrical $12k 132k
kWh
3.2%
- Natural Gas $6.8k -
MMBtu
-
Waste $0.4k
Productivity/Other $2.7k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall