ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

1,529

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $683k 88k
MMBtu
$12.29
- Electrical $385k 4,834k
kWh
$0.15
- Natural Gas $150k 34k
MMBtu
$6.21

12,108

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 9.6k
MMBtu
10.9%
- Electrical $83k 936k
kWh
19.4%
- Natural Gas $6.7k -
MMBtu
-
Waste $11k
Productivity/Other $68k
TOTAL $195k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,458

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $672k 89k
MMBtu
$11.81
- Electrical $378k 4,889k
kWh
$0.14
- Natural Gas $150k 35k
MMBtu
$5.91

5,487

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.2k
MMBtu
3.6%
- Electrical $27k 311k
kWh
6.4%
- Natural Gas $2.6k -
MMBtu
-
Waste $3.0k
Productivity/Other $22k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall