ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

1,594

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $690k 86k
MMBtu
$12.90
- Electrical $387k 4,746k
kWh
$0.15
- Natural Gas $149k 33k
MMBtu
$6.36

12,632

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $122k 9.6k
MMBtu
11.2%
- Electrical $86k 937k
kWh
19.7%
- Natural Gas $7.0k -
MMBtu
-
Waste $11k
Productivity/Other $67k
TOTAL $200k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,524

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $682k 88k
MMBtu
$12.36
- Electrical $385k 4,820k
kWh
$0.15
- Natural Gas $149k 33k
MMBtu
$6.20

5,655

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 3.1k
MMBtu
3.6%
- Electrical $27k 306k
kWh
6.3%
- Natural Gas $3.1k -
MMBtu
-
Waste $2.9k
Productivity/Other $21k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall