ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

567

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 121k
MMBtu
$8.54
- Electrical $374k 6,678k
kWh
$0.086
- Natural Gas $86k 36k
MMBtu
$3.67

4,342

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 12k
MMBtu
9.8%
- Electrical $66k 1,157k
kWh
17.3%
- Natural Gas ($-7.4)k -
MMBtu
-
Waste $2.6k
Productivity/Other $88k
TOTAL $164k
*May be negative reflecting an increased cost component required to save energy and costs overall

539

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 123k
MMBtu
$8.34
- Electrical $371k 6,703k
kWh
$0.086
- Natural Gas $86k 37k
MMBtu
$3.58

1,653

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.5k
MMBtu
2.8%
- Electrical $21k 338k
kWh
5.0%
- Natural Gas ($-0.2)k -
MMBtu
-
Waste $1.0k
Productivity/Other $29k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall