Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

388

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $892k 187k
MMBtu
$5.81
- Electrical $463k 10,510k
kWh
$0.051
- Natural Gas $289k 70k
MMBtu
$4.95

2,745

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 9.4k
MMBtu
5.0%
- Electrical $40k 917k
kWh
8.7%
- Natural Gas $37k -
MMBtu
-
Waste $6.6k
Productivity/Other $32k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall

384

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $892k 188k
MMBtu
$5.78
- Electrical $461k 10,515k
kWh
$0.051
- Natural Gas $291k 71k
MMBtu
$4.93

1,492

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.8k
MMBtu
2.0%
- Electrical $18k 372k
kWh
3.5%
- Natural Gas $17k -
MMBtu
-
Waste $4.1k
Productivity/Other $12k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall