ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

390

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,903k 351k
MMBtu
$7.86
- Electrical $1,206k 22,888k
kWh
$0.068
- Natural Gas $429k 79k
MMBtu
$6.88

2,621

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $128k 14k
MMBtu
4.0%
- Electrical $80k 1,373k
kWh
6.0%
- Natural Gas $27k -
MMBtu
-
Waste $1.8k
Productivity/Other $18k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

373

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,907k 357k
MMBtu
$7.71
- Electrical $1,206k 23,252k
kWh
$0.067
- Natural Gas $429k 80k
MMBtu
$6.60

1,087

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.9k
MMBtu
1.4%
- Electrical $27k 475k
kWh
2.0%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $4.3k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall